Overload has caused visible cracks and deformations on runways at the Nội Bài airport. — VNA/VNS Photo Việt Hùng |
HÀ NỘI — The Ministry of Transport has submitted a report to the Prime Minister requesting funding to renovate and upgrade the runway and taxiway system at
According to the report, signed by transport deputy minister Lê Anh Tuấn, the two biggest international airports in the country are under great pressure.
In particular,
While the Aviation Corporation of
Previously, the Ministry of Transport made a proposal to the PM to invest in upgrading the runway and taxiway at
The Ministry of Planning and Investment had asked the Ministry of Transport to
This was to be the basis to propose to the Prime Minister to use some 10
However, in a separate plan submitted to the Government, the Ministry of Planning and Investment only planned to allocate to the Ministry of Transport 10 per cent of the medium-term public investment plan to repay loans for build-transfer (BT) projects and for urgent traffic projects.
Therefore, the Ministry of Transport proposed the Prime Minister consider adding more funding to the Ministry of Transport for the renovation of runways and taxiways in
The Ministry of Transport has estimated runway renovation costs would amount to around VNĐ4.5 trillion (US$193 million). — VNS