

The Hà Nội People’s Committee yesterday kicked off construction of a flyover connecting Ô Đông Mác and Nguyễn Khoái to ease traffic congestion on the Ring Road 1.
![]() |
The Hà Nội People’s Committee yesterday kicked off construction of a flyover connecting Ô Đông Mác and Nguyễn Khoái to ease traffic congestion on the Ring Road 1. The steel flyover, with a length of 232m and width of 12m, will be built at a total cost of VNĐ168 billion (US$7.5 million). It spans a length of 595.7m with two nine-metre lanes, allowing vehicles to run at speeds of up to 40km per hour. – VNA/VNS Photo Huy Hùng