Updated  
October, 12 2012 10:42:57

Residents fear for safety in leaning building of Ha Noi

 

Cracks up to 5cm wide run across passages in a residential building in Ha Noi's Tan Mai Ward. — VNS Photo Thu Hien
HA NOI — Hundreds of people living in a residential block in Ha Noi's Tan Mai Ward are fearing for their safety as the 28-year-old building is seriously leaning and facing collapse.

They are being kept waiting for a final decision from the city's Construction Department and other relevant authorities who are deciding whether building A7 can be amended or if removing its 250 residents to another area will be necessary instead.

Ceilings in the five-floor building are being propped up by a steel shelf system that is totally separating from the walls. Clefts up to 5cm wide run down the staircases, walls and floors of the apartments, which slope left. Rainwater drainage pipelines are broken, leading to all fifth-floor apartments becoming inundated with water during the flood season.

Nguyen Thanh Lang, 75, who lives in a third-floor apartment yesterday said: "The framework of my doors and windows has been deformed so they are impossible to close. Some small furniture has been moving due to the tilting floor."

He said he is very worried about the safety of his family members.

"We are living in fear everyday. I don't have any deep sleep at nights because I have to wake up to check if any shaking happens in the building."

Nguyen Quang Gang, head of the local resident board said the depression of the building started taking place five years ago. When the situation worsened, residents urged the relevant agencies including Ha Noi Housing Development and Management Company - responsible for managing residential buildings in Tan Mai Commune - and the commune's People's Committee to make an inspection and work out solutions for repair.

One year later, the company made its first inspection which concluded that "the building is in a seriously dangerous situation and requires an urgent fixing plan," Gang said.

However, no urgent action has been taken since then except for the introduction of the steel shelf last year to prop up the floor and staircases, he said.

Vu Ngoc Cuong, deputy chairman of the ward's People's Committee said that all relevant documents had been sent to the Construction Department about the situation and suggested that people in the building should be removed to another place.

However, Cuong said that the department concluded that the building was not at a level dangerous enough to require the removal of occupants when they investigated two years ago.

The committee kept urging for new inspections and a reconsideration of the removal plan but accepted that the allocation of permanent accommodation for such a large number of people would take time, so the relevant agencies needed to process carefully.

Nguyen Quoc Tuan, deputy director of the department, accepted the need for a final conclusion about the situation and requested another inspection. This reportedly took place last Monday, although no official conclusion has been released.

Cuong said the committee already drafted a preparatory plan to remove people from the building to a temporary place when the storms or floods happen in the coming rainy season. — VNS

COMMENTS
Vietpete - standenp@yahoo.com   Ms
October, 12 2012 14:12:07
5 years and numerous inspections presumably at some point a decision will be made about the buildings safety.........lets hope its not AFTER it collapses.
Send Us Your Comments:
Name:
Your E-mail address:
Title:
 

VietNamNews may edit your comments and not all emails will be published.

Highlight

Mekong summit calls for greater riparian co-operation Mekong summit calls for greater riparian co-operation

Mekong River riparian countries have improved co-operation since the first Mekong River Commission (MRC) summit held in Thailand four years ago, a senior Vietnamese official has said.

Viet Nam attempts to hold back deadly measles strain Viet Nam attempts to hold back deadly measles strain

The head of Viet Nam's General Department of Preventive Medicine, Tran Dac Phu, announced on Tuesday that the department would work to contain the outbreak of measles over the coming months.

Da Nang plans a greener future Da Nang plans a greener future

The central city of Da Nang will have a face-lift as it becomes a green city following the Prime Minister's decision on the city's adjusted master urban plan for 2030 and 2050.

Delta households face water shortage Delta households face water shortage

More than 377,000 people in the Cuu Long (Mekong) Delta face a fresh water shortage because of saline water intrusion in the area, according to the National Centre for Rural Clean Water Supply and Environmental Sanitation.

Ha Noi to host National Shooting Cup 1    Ha Noi to host National Shooting Cup

The National Shooting Cup is scheduled to take place in the Ha Noi-based National Sports Training Centre from April 16 to 24.